Zaporizhstal, Ukraine’s third-largest metallurgical plant accounting for 29.4% of the country’s flats output, became our longtime partner when it came to revamping and modernizing the facility’s various systems.
- Comprehensive repairs at BF-4
- Project for installing a PT-35-2.9/0.8/0.1 turbine generator
- Engineering documentation for steel production revamp, including the construction of a BOF shop
- Project for installing a PCI unit for BFs (jointly with Germany’s Kuttner)
- Design engineering for the plant’s gas supply system
- Project for reconstruction of the plant’s DDS system and dust extraction unit
- Project for removing utility networks from the steel smelting installation construction zone
- Project for revamping blast-furnace gas bleeder