Our partnership with the Ukrainian integrated steel company began when we installed a T-25/8.8 turbine generator at the plant in 1995. Since then we have been handling technical maintenance activities there, repairing and replacing equipment, and upgrading equipment to boost its energy efficiency.

  • Developing the facility’s overall energy resources production/consumption balance for 2022
  • Developing atmospheric emissions substantiation paperwork for approval by the Ministry of Environmental Protection and Natural Resources of Ukraine bodies
  • Constructing process and heating boiler plant to cover the needs of the facility’s mining and concentrating area
  • Installing a K5500-42-1 compressor with a VKV22 turbine
  • Installing a K1700-61-1 #13 compressor for the air separation shop
  • Revamping a GM-50 boiler
  • Environmental and thermal engineering testing of steam boilers
  • Revamping steam blower co-generation plant #3 with the replacement of a K-3000 compressor with a K-5500 unit
  • Project development for installing a PCI unit for BF #9 (jointly with Luxembourg’s Paul Wurth).

CONTACTS

Our company is open to discussing technical challenges
and long-term partnerships.

TURKEY

ENERGOCHERMET INT ENGINEERING
INDUSTRIAL TRADE LIMITED COMPANY

TURKEY, GÜZELOBA MAH. RAUF DENKTAS CAD. NO: 56 IÇ KAPI NO: 102 MURATPASA/ ANTALYA
ZİP 07000

Tel./Fax: +905318557143
energochermet.int@gmail.com