Assembly, startup, and commissioning activities at thermal power plants, co-generation plants, heating and production boiler plants, waste-heat boilers, and various production systems. Prompt specialist on-site visits to evaluate the scope of work, assembly, and startup of new or revamped equipment.
Commissioning of the following equipment:
- Steam and water-heating boilers, waste-heat boilers
- Steam and water cooling systems for metallurgy furnaces
- Manufactured and exhaust gas treatment systems
- Water treatment equipment
- Pump station
- Turbine, electric actuator, and compressor shops
- CCGT-actuated turbine generators
- Industrial furnaces
Assembly, startup, and commissioning of steam and water boilers, waste-heat boilers, and their auxiliary equipment.
Proof-of-compliance environmental, thermal engineering, and water testing.
Expert assistance in equipment operation, preparation of schedule drawings, engineering instructions, and data sheets.
Preparation of process flowcharts with a focus on reliability and safety of operation.